$3,499,000
3rd

116 NW 3rd Court, Boca Raton FL 33432

5 Beds

6 Baths

SQFT 8,621

3 Garage

-1 Years Built

Home Details

Walking distance to downtown Boca Raton and Mizner Park, and just 1.5 miles from the Atlantic Ocean and public beach access. Stunning contemporary new construction offering 5 bedrooms and 6 baths, including a flexible first-floor bedroom/office with full bath. The spacious primary suite features a private balcony, spa-inspired bath with separate shower and soaking tub, and dual walk-in closets. Open-concept kitchen with large island flows seamlessly into the living and dining areas, ideal for entertaining. Hurricane-impact windows and doors, 3-car garage, abundant storage, and an elevator shaft designed for a future elevator, available as an optional upgrade. Estimated completion April 2027.

Other Interior Features

Heating
Central
Appliances
Electric Water Heater, Dishwasher, Disposal, Dryer, Ice Maker, Microwave, Electric Range, Refrigerator, Washer
Living Area - SqFt
4000
Inside
Electric Water Heater, Dishwasher, Disposal, Dryer, Ice Maker, Microwave, Electric Range, Refrigerator, Washer
Total - SqFt
8621

General

MLS#
B26078225
Architectural Style
Two Story, Modern/Contemporary
Bathroom Features
Dual Sinks, Shower Only, Tub Only
Living Area - SqFt
4000
Construction Materials
CBS Construction
Window Features
Complete Impact Glass
Total - SqFt
8621

Neighbourhood

Location

Walking distance to downtown Boca Raton and Mizner Park, and just 1.5 miles from the Atlantic Ocean and public beach access. Stunning contemporary new construction offering 5 bedrooms and 6 baths, including a flexible first-floor bedroom/office with full bath. The spacious primary suite features a private balcony, spa-inspired bath with separate shower and soaking tub, and dual walk-in closets. Open-concept kitchen with large island flows seamlessly into the living and dining areas, ideal for entertaining. Hurricane-impact windows and doors, 3-car garage, abundant storage, and an elevator shaft designed for a future elevator, available as an optional upgrade. Estimated completion April 2027.

Schedule Visit

    Translate »